img

Over the past 10 years, we have worked on countless balconies, and observed many different failure types in problematic areas such as the primary membrane, deck-to-wall transition, penetrations, railings, and the structure itself.  Most failures are due to incompatible products and or inexperienced installers.   We understand every balcony and application is different and must be assessed with the knowledge of what products are best suited for the repair or new construction installation.

We replace and repair every type of balcony configuration, whether it is a wood deck sleeper system, tile with or without concrete topping slab, or liquid-applied deck coating systems over both wood and concrete.

For those looking to do renovations, FCC has you covered. We can rebuild and renovate everything from roof configurations for aesthetic reasons or better drainage ability to commercial frontage, and historic facades.

Renovations done by Florida Certified Contractors are not only visually appealing, but also help increase a structure’s value as well as preserve its life and integrity.

Our Processes Guarantee Success

01

Initial Consultation

Reach out to us via phone, email, or our website form. We'll discuss your needs, concerns, and initial project ideas. Duration: Typically 15 minutes to 1 hour.

02

Site Visit & Assessment

Our team will visit your property to assess the current condition, understand the project's scope, and take necessary measurements. Duration: Depending on the project size, anywhere from 1-4 hours.

03

Detailed Proposal

Based on our assessment, we'll provide a detailed proposal. This includes a breakdown of costs, materials, labor, and a projected timeline. Duration: Typically provided within 3-7 days post site visit.

04

Contract Finalization

After reviewing the proposal and making any necessary adjustments, we'll finalize the contract. This will include payment terms, project milestones, and other specifics. Duration: Varies based on negotiations and changes, typically 1-3 weeks.

05

Project Commencement

With the contract in place, our skilled crew will begin the work. We'll ensure regular communication, providing updates and addressing any concerns. Duration: Varies based on project complexity and size.

06

Quality Assurance & Inspections

As milestones are reached, our quality assurance team will inspect the work, ensuring it meets FCC's high standards and adheres to all regulations. Duration: Varies, but inspections typically last 1-3 hours.

07

Project Completion & Walkthrough

Once the work is finished, we'll do a final walkthrough with you, ensuring complete satisfaction. Any tweaks or adjustments are addressed promptly. Duration: 1-2 hours.

08

Post-Project Support

Our relationship doesn't end once the project is done. We're here for any follow-up queries, maintenance tips, or future project discussions. Duration: Ongoing.

How can we help?

We look forward to discussing your project!

Submit our form to request a free consultation. We'll discuss your project and see if we're a good fit. We look forward to delivering you unmatched service and quality.

Request A Consultation